A static equipment foundation is an eccentrically loaded footing with one extra ingredient an ordinary column footing doesn't need — an anchor-bolt group that has to be checked for net uplift, since a large enough operating moment can pull one side of the base into tension.

Every check above runs automatically inside the Structyze Equipment Foundation module — this particular module is part of the full desktop catalogue rather than the free browser trial, since the trial only carries a curated flagship set. You can still try the free trial modules right now to see the same calculation style in action on RCC Beam, Column, Slab and a handful of others.

The Example We'll Use

  • Footing 3 × 2.2 m × 500 mm
  • Pedestal 600 mm square; cover 50 mm
  • Equipment weight 150 kN, operating moment 20 kN·m
  • Allowable bearing 150 kN/m²
  • 4 × M24 anchor bolts, 2 rows at 500 mm

Working Through It

The eccentricity from the operating moment, e = M/(P+Wself) = 20/232.5 ≈ 0.086 m, sits comfortably within the middle-third limit of 0.5 m — the bearing pressure distribution stays a simple trapezoid, no partial-contact complication. Factored bearing pressure qu,max ≈ 56.7 kN/m² against 150 kN/m² allowable.

One-way and punching shear both check exactly as an isolated footing would, both passing with wide margin. Flexure at the pedestal face needs only minimum steel (667 mm²/m against 754 mm²/m provided) — the modest moment here doesn't stress the footing much.

The anchor-bolt check is the really distinct step: treating the 4-bolt group elastically under Nmin = 1.0(150) = 150 kN and MEd = 1.5(20) = 30 kN·m, the extreme bolt force works out to 150/4 − 30(0.25)/[4(0.25)²] = 37.5 − 30 = +7.5 kN — still compression, not tension. No bolt sees net uplift at this moment level.

What Governs, and Why

With this modest operating moment, every check carries real margin and no anchor bolt sees net tension — flexure (minimum steel, utilisation 0.88) is the tightest number, essentially a formality. Increase the equipment's operating moment from its real duty case, though, and the bolt-uplift and bearing checks come alive fast, since the extreme-bolt-force calculation is directly proportional to M.

Where Structyze Takes Over

Every check above runs automatically inside the Structyze Equipment Foundation module — this particular module is part of the full desktop catalogue rather than the free browser trial, since the trial only carries a curated flagship set. You can still try the free trial modules right now to see the same calculation style in action on RCC Beam, Column, Slab and a handful of others.

For Equipment Foundation and the rest of the full catalogue — 80+ components across RCC, Steel, Composite, Timber, Masonry and more, across 20+ design codes — buy the full Structyze desktop app or see everything it does on the Software page.

Quick FAQ

What's the difference between this and an ordinary isolated footing?

The bearing, shear and flexure checks are structurally identical to an isolated footing under eccentric load — the new piece is the anchor-bolt group check, treating the bolts as an elastic group resisting net uplift from the operating moment, which an ordinary column footing (with no equipment mounted on it) never needs.

What isn't verified in this anchor-bolt check?

Concrete cone breakout and pull-out capacity per EN 1992-4 aren't checked here — only the elastic bolt-force distribution itself. A bolt showing tension in this check still needs its embedment verified separately against cone breakout, which can govern before the bolt's own steel capacity does.

Final Thoughts

The anchor-bolt uplift check is the one genuinely new piece of engineering an equipment foundation adds over an ordinary footing — and it's the check that actually responds to how hard the real machine's operating moment pushes, unlike the bearing and shear checks which barely move at this load level.