A composite steel-concrete beam designed to China's GB 50017 follows the same full-composite-versus-partial-composite logic discussed for the AS 4100 example elsewhere in this series, but checks shear stud demand using GB 50017's own stud capacity formula, which incorporates the stud's own ultimate tensile strength directly rather than relying solely on a concrete-crushing-governed value.

Every check above runs automatically inside the Structyze Composite Beam module — this particular module is part of the full desktop catalogue rather than the free browser trial, since the trial only carries a curated flagship set. You can still try the free trial modules right now to see the same calculation style in action on RCC Beam, Column, Slab and a handful of others.

The Example We'll Use

  • Beam: HN400×200 steel section, f_y 235 MPa, composite with 120 mm concrete slab, f_cu (cube strength) 30 MPa, effective width 2.0 m
  • Span: 8.0 m, design moment M: 320 kN·m
  • Shear studs: 19 mm diameter, ultimate tensile strength f_u 400 MPa

Working Through It

Full composite moment capacity: with the plastic neutral axis confirmed within the slab (concrete compressive capacity exceeding the steel section's tensile yield force), φM_u = 365 kN·m. Utilization: 320/365 = 0.88.

Shear stud capacity per stud under GB 50017's formula, taking the lesser of the concrete-crushing-governed value and a value based on the stud's own ultimate tensile strength and cross-sectional area: for this stud diameter and concrete grade, the governing (lower) value is 85 kN per stud.

Total horizontal shear force for full composite action: 1,410 kN. Required stud count: 1410/85 = 17 studs along the half-span (34 total for the full span).

With 36 studs provided in the actual layout, full composite action is confirmed, consistent with the full-composite moment capacity used above.

What Governs, and Why

Flexural capacity governs at utilization 0.88, contingent on the stud layout actually delivering full composite action as checked — the specific governing stud capacity value here came from the stud's own tensile strength limit rather than concrete crushing, a reminder that GB 50017's dual-check stud capacity formula (unlike some codes that rely on concrete crushing alone) means a higher-grade stud material can sometimes change which failure mode actually governs stud capacity.

Where Structyze Takes Over

Every check above runs automatically inside the Structyze Composite Beam module — this particular module is part of the full desktop catalogue rather than the free browser trial, since the trial only carries a curated flagship set. You can still try the free trial modules right now to see the same calculation style in action on RCC Beam, Column, Slab and a handful of others.

For Composite Beam and the rest of the full catalogue — 80+ components across RCC, Steel, Composite, Timber, Masonry and more, across 20+ design codes — buy the full Structyze desktop app or see everything it does on the Software page.

Quick FAQ

Does a higher-strength stud always increase a composite beam's stud capacity?

Only if the stud's own tensile strength is the governing limit rather than concrete crushing around the stud — for a lower-strength concrete slab, concrete crushing may govern regardless of stud strength, meaning a higher-grade stud wouldn't improve capacity in that scenario.

Is GB 50017's composite beam design philosophy fundamentally different from AISC 360's, discussed elsewhere in this series?

The core plastic moment capacity and shear connection logic are conceptually similar across both codes, reflecting shared underlying composite beam mechanics, though the specific stud capacity formulas, safety factors, and effective width provisions differ in their exact numerical formulation.

Final Thoughts

This beam's stud capacity happened to be governed by the stud's own tensile strength rather than concrete crushing — a reminder that GB 50017's dual-check stud formula means the governing mechanism, and therefore the most effective lever for improving stud capacity, isn't automatically the same from one project to the next.